Pages Navigation Menu

Integrate 3D digital models into Coswin 8i

Posted on 2022-02-28

Integrate 3D digital models into Coswin 8i

All Siveco Group digital products based on Coswin 8i and bluebee® are designed to integrate BIM models to address your operational and maintenance needs. Building Information Modeling (BIM) refers to a digital representation of physical and functional characteristics of a facility. This Tips & Tricks article looks more particularly at BIM in our CMMS Coswin 8i.

read more

Smart O&M: the 8 hidden gems of Coswin 8i

Posted on 2021-11-22

Smart O&M: the 8 hidden gems of Coswin 8i

This Tip & Tricks is dedicated to 8 advanced yet little-known standard features that make Coswin 8i a true Smart Operation & Maintenance solution, far beyond traditional plant maintenance solutions.

read more

Sharing experience in controlling industrial risks using Smart O&M

Posted on 2021-10-14

Sharing experience in controlling industrial risks using Smart O&M

Siveco China made a strong showing in the September 2021 issue of the Asia Pacific Urban Association (APUEA) magazine, with an article by our Managing Director on “Controlling your industrial risks”.

read more

Smart O&M as a tool for continuous improvement at BEGSE

Posted on 2021-09-15

Smart O&M as a tool for continuous improvement at BEGSE

By defining the “Core Model”, Siveco China has established a comprehensive maintenance management system for BEGSE, including technical data management, HSE management, preventive work planning, spare parts management, procurement management and decision support.

read more

A summer with Smart O&M in China and on the Belt & Road

Posted on 2021-08-18

A summer with Smart O&M in China and on the Belt & Road

During the summer, the Siveco China team has been busy on many projects in China and overseas. As the world saw a resurgence of Covid-19, affecting travel in parts of China, and more heavily impacting other countries, we continued to try to proactively address our clients’ needs.

read more

Implementing “5 Whys and 1 How” in Coswin 8i

Posted on 2021-05-6

Implementing “5 Whys and 1 How” in Coswin 8i

As part of their WCM, Lean or TPM approach, some of our customers follow the 5W+1H (“5 Whys and 1 How”) process, or similar methodologies, to help identify the root causes of failures. This process can be supported, and all related information recorded, in a tab of the Coswin work order, to ensure the process is systematically followed and to allow systematic analysis of failures.

read more
Follow us
on WeChat