Pages Navigation Menu

Maintenance preparation support for Indonesia’s Banjarsari power plant with CNEEC

Posted on 2016-05-31

Maintenance preparation support for Indonesia’s Banjarsari power plant with CNEEC

PT Bukit Asam (PTBA) is an Indonesian state-owned coal mining company, partly listed on the Indonesian stock exchange. The second largest coal producer in Indonesia, with mineable reserves of approximately 7.3 billion tons, PTBA strives to become a competitive energy company. The 2x135MW power plant, a total investment of 240M USD, is located in South Sumatra province. China National Electric Equipment Corporation (CNEEC) was selected as the EPC contractor for this project. Construction started in April 2012.

read more

Partner meetings with Siveco China in Tunisia

Posted on 2016-05-31

Partner meetings with Siveco China in Tunisia

Our Managing Director Bruno was in Tunisia the third week of April for business development meetings with our African partners. The trip started with a visit to the scenic town of Sidi Bou Said for a seafood lunch with colleagues Adel Kalai and Claude Tombu, two of the key people behind the company’s development in Africa. On the way from Tunis to Sidi Bou Said, several Siveco client sites are visible, including power plants operated by the national power company STEG (Societe Tunisienne de l’Electricite et du Gaz).

read more

Coswin: Personalisation tools

Posted on 2016-05-31

Coswin: Personalisation tools

This months tips & tricks covers the powerful “personalisation” tools of Coswin, which we use to simply the user interface of the system and prove to be immensely valuable for projects in China, where many maintenance staff may have never used a CMMS before. Customers can make further use of those tools to modify or improve their user interface in the future, without involvement from Siveco.

read more

The difference between Planning and Scheduling

Posted on 2016-05-3

The difference between Planning and Scheduling

Too many people confuse Planning and Scheduling, two related but different processes. In this brief article, we would like to clarify the difference between the two.

read more

Hazardous waste incineration plant optimizes plant inspections with bluebee® mobile solution

Posted on 2016-05-3

Hazardous waste incineration plant optimizes plant inspections with bluebee® mobile solution

The bluebee® project aim was to improve the quality of maintenance by standardizing the inspection content (such as routine and daily inspection) and increasing the reliability of data coming from the field. The use of bluebee® was to eliminate the traditional paper work orders from the CMMS system and help establishing a real inspection database for diagnosis and performance analysis.

read more

Scheduling with Coswin 8i: the Organizer tool

Posted on 2016-05-3

Scheduling with Coswin 8i: the Organizer tool

In this Tips & Tricks, we would like to briefly outline the Coswin 8i Scheduling tool. For more on the differences between Planning and Scheduling, see this Reliability article. Talk to your Siveco consultant for more details! There are two main ways to use this advanced scheduling tool:

read more
Follow us
on WeChat