Exploring the bathtub curve

The “bathtub curve” maps the failure rate over time for complex electro-mechanical systems such as machines or plants. Its shape is the same all over the world, but certain characteristics of Chinese construction projects tend to result in a less optimized curve. Let us explore the bathtub curve!
read morebluebee® cloud: BIM and Facilities Management: why and how?

Building information modeling (BIM) is a process involving the generation and management of digital representations of physical and functional characteristics of a facility. The resulting building information models become shared knowledge resources to support decision-making about a facility from earliest conceptual stages, through design and construction, through its operational life and eventual demolition.
read moreImplementing a CMMS during plant construction

Experience has shown that the earlier reliability and maintainability are taken into account in a construction project, the better. This approach, which consists in paying more attention to maintenance earlier in the project, to reduce future operation cost, differs markedly from that of most Asian engineering and construction companies, which emphasize cost control during construction with progressive adjustments and modifications of the design as the project moves ahead.
read morePreparing maintenance from the construction stage

Experience has shown that the earlier reliability and maintainability are taken into account in a construction project, the better. These should be specifically addressed from the design stage of a project, as illustrated below. This approach, which consists in paying more attention to maintenance earlier in the project, to reduce future operation cost, differs markedly from that of Chinese engineering and construction companies.
read moreThe difference between Planning and Scheduling

Too many people confuse Planning and Scheduling, two related but different processes. In this brief article, we would like to clarify the difference between the two.
read more5 reasons GMs chose to upgrade to Coswin 8i

For this article, we have talked to the General Managers of plants that have upgraded from Coswin 7i to 8i. We asked them what they liked in the new version and why was it worth upgrading. Here is their feedback.