Pages Navigation Menu

Latest issues

Implementing “5 Whys and 1 How” in Coswin 8i

Posted on 2021-05-06

Implementing “5 Whys and 1 How” in Coswin 8i

As part of their WCM, Lean or TPM approach, some of our customers follow the 5W+1H (“5 Whys and 1 How”) process, or similar methodologies, to help identify the root causes of failures. This process can be supported, and all related information recorded, in a tab of the Coswin work order, to ensure the process is systematically followed and to allow systematic analysis of failures.

read more

Optimize the Asset Lifecycle Management of water infrastructure: Siveco’s footprint in the water market

Posted on 2021-05-06

Optimize the Asset Lifecycle Management of water infrastructure: Siveco’s footprint in the water market

An active player in the Chinese water market since 2004, Siveco frequently networks with clients and other market stakeholders. Recently our “Smart Water” team joined the 19th Water Sector Strategic Forum 2021 in Beijing and the IE expo in Shanghai.

read more

Three practical findings from applying BIM in China

Posted on 2021-04-01

Three practical findings from applying BIM in China

Building information modelling (BIM) refers to the development of tridimensional digital representations of facilities. With proven benefits in design and construction, BIM is becoming mandatory for environmental infrastructures all over the world. Demand is now growing to extend its usage to Operation & Maintenance (O&M).

read more

How Smart O&M assists the wastewater division of Jiangsu Sino French Water in the implementation of O&M best practices

Posted on 2021-04-01

How Smart O&M assists the wastewater division of Jiangsu Sino French Water in the implementation of O&M best practices

In this project, the wastewater company adopted the latest technology of Siveco’s Smart O&M solutions including the mobile app for maintenance management. All technical data, work orders, work instructions and reports, etc. are stored in the back-office system. The system generates work tasks or work orders from predefined strategy, plans and frequencies. The work orders will be displayed on the user’s PC dashboard, according to the specified date, which is very intuitive.

read more

2020 Customer Satisfaction Survey Report

Posted on 2021-03-03

2020 Customer Satisfaction Survey Report

In this month’s newsletter, we are pleased to share the results of our 2020 customer satisfaction survey, which focuses on Support and Product for customers under support. The purpose of the survey is to strengthen our relationship with customers, identify their long-term needs and constantly improve our products and customer services.

read more

2021 Siveco “European Royalty” annual dinner

Posted on 2021-03-02

2021 Siveco “European Royalty” annual dinner

On Jan 28, 2021, Siveco China team gathered at Millennium Hongqiao Hotel for annual dinner on the theme of “European Royalty” where the team’s talent was on full display for a night of fun! Siveco members dressed up in European Renaissance and Enlightenment period costumes and prepared great entertainment for all to enjoy. The party was organized by our admin team.

read more
Follow us
on WeChat