
{"id":2675,"date":"2011-01-24T09:20:31","date_gmt":"2011-01-24T01:20:31","guid":{"rendered":"http:\/\/www.sivecochina.com\/en\/?p=2675"},"modified":"2014-10-22T09:27:04","modified_gmt":"2014-10-22T09:27:04","slug":"coswin-tips-tricks-meters","status":"publish","type":"post","link":"https:\/\/newsletter.bluebeecloud.com\/en\/tips-tricks\/coswin-tips-tricks-meters\/","title":{"rendered":"COSWIN: Meters"},"content":{"rendered":"<div style=\"text-align: justify;\">Some jobs are triggered by a meter reaching a certain level, kilometers travelled by trucks, for instance, or tons of ice cream produced. Other jobs require either a meter and or a calendar as a job trigger.<\/div>\n<p>\u00a0<\/p>\n<div style=\"text-align: justify;\">COSWIN therefore allows an easy way to structure meters into a family and give the values of the coefficients. It also allows you to simulate the effects of meter updates. Value check is run by COSWIN to verify the coherence of meter structures and any potential errors are displayed.<\/div>\n<p>\u00a0<\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 560px; height: 220px;\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.sivecochina.com\/sites\/default\/files\/oldsitefile\/en\/wp-content\/uploads\/2011\/01\/COSWIN_EN_01.jpg\" alt=\"\" width=\"550\" height=\"215\" \/><\/div>\n<p>\u00a0<\/p>\n<table style=\"text-align: justify;\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td style=\"border: #000000 1px groove;\"><strong>What happens to metering when an equipment is removed?<\/strong> As background read \u201c<a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/coswin-tips-tricks\/coswin-tips-tricks-repairable-standby-equipment\/\" target=\"_blank\">Repairing Equipment<\/a>\u201d<br \/>\n\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div style=\"text-align: justify;\">\u2460 When an item of equipment, also declared as a repairable is removed, in this case S-1 \u2461 It is received into the Stock and at this point COSWIN \u2462 will write into the Equipment record the exit value of the meter for that particular repairable item \u2463 COSWIN also writes into the stock record of the repairable the value at which it came in at, that is 23000 \u2464 The Stock item that is going to replace S-1, namely S-2 is now issued from stock and \u2465 replaces the old S-1. COSWIN now writes the cumulative value of the item onto the equipment record, that is 17000.<\/div>\n<p>\u00a0<\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 505px;\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.sivecochina.com\/sites\/default\/files\/oldsitefile\/en\/wp-content\/uploads\/2011\/01\/COSWIN_EN_02.jpg\" alt=\"\" width=\"535\" height=\"500\" \/><\/div>\n<p>\u00a0<\/p>\n<div style=\"text-align: justify;\">All the above takes place with a work order, refer to chapter on <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/coswin-tips-tricks\/coswin-tips-tricks-repairable-standby-equipment\/\" target=\"_blank\">repairing equipment<\/a>.<\/div>\n<p>\u00a0<\/p>\n<table style=\"border: #000000 1px groove;\" border=\"0\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td colspan=\"2\"><strong>Some other features of meters:<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"vertical-align: top;\">\u2022<\/td>\n<td>They can be \u201cvirtual\u201d, that is equipment can be updated on its meter value without having first to create a meter. For instance, in the illustration above, Eqp 2-C need not have a meter<\/td>\n<\/tr>\n<tr>\n<td style=\"vertical-align: top;\">\u2022<\/td>\n<td>As well as cumulative meters can be incremental, that is only the last value is taken to allow forecasted consumption<br \/>\n\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<div style=\"text-align: justify;\">Some jobs are triggered by a meter reaching a certain level, kilometers travelled by trucks, for instance, or tons of ice cream produced. Other jobs require either a meter and or a calendar as a job trigger.<\/div>\n<p>\u00a0<\/p>\n<div style=\"text-align: justify;\">COSWIN therefore allows an easy way to structure meters into a family and give the values of the coefficients. It also allows you to simulate the effects of meter updates. Value check is run by COSWIN to verify the coherence of meter structures and any potential errors are displayed.<\/div>\n<p>\u00a0<\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 560px; height: 220px;\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.sivecochina.com\/sites\/default\/files\/oldsitefile\/en\/wp-content\/uploads\/2011\/01\/COSWIN_EN_01.jpg\" alt=\"\" width=\"550\" height=\"215\" \/><\/div>\n<p>\u00a0<\/p>\n<table style=\"text-align: justify;\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td style=\"border: #000000 1px groove;\"><strong>What happens to metering when an equipment is removed?<\/strong> As background read \u201c<a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/coswin-tips-tricks\/coswin-tips-tricks-repairable-standby-equipment\/\" target=\"_blank\">Repairing Equipment<\/a>\u201d<br \/>\n\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div style=\"text-align: justify;\">\u2460 When an item of equipment, also declared as a repairable is removed, in this case S-1 \u2461 It is received into the Stock and at this point COSWIN \u2462 will write into the Equipment record the exit value of the meter for that particular repairable item \u2463 COSWIN also writes into the stock record of the repairable the value at which it came in at, that is 23000 \u2464 The Stock item that is going to replace S-1, namely S-2 is now issued from stock and \u2465 replaces the old S-1. COSWIN now writes the cumulative value of the item onto the equipment record, that is 17000.<\/div>\n<p>\u00a0<\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 505px;\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.sivecochina.com\/sites\/default\/files\/oldsitefile\/en\/wp-content\/uploads\/2011\/01\/COSWIN_EN_02.jpg\" alt=\"\" width=\"535\" height=\"500\" \/><\/div>\n<p>\u00a0<\/p>\n<div style=\"text-align: justify;\">All the above takes place with a work order, refer to chapter on <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/coswin-tips-tricks\/coswin-tips-tricks-repairable-standby-equipment\/\" target=\"_blank\">repairing equipment<\/a>.<\/div>\n<p>\u00a0<\/p>\n<table style=\"border: #000000 1px groove;\" border=\"0\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td colspan=\"2\"><strong>Some other features of meters:<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"vertical-align: top;\">\u2022<\/td>\n<td>They can be \u201cvirtual\u201d, that is equipment can be updated on its meter value without having first to create a meter. For instance, in the illustration above, Eqp 2-C need not have a meter<\/td>\n<\/tr>\n<tr>\n<td style=\"vertical-align: top;\">\u2022<\/td>\n<td>As well as cumulative meters can be incremental, that is only the last value is taken to allow forecasted consumption<br \/>\n\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"author":1,"featured_media":8354,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[17,259],"tags":[98],"_links":{"self":[{"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/posts\/2675"}],"collection":[{"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/comments?post=2675"}],"version-history":[{"count":3,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/posts\/2675\/revisions"}],"predecessor-version":[{"id":8552,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/posts\/2675\/revisions\/8552"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/media\/8354"}],"wp:attachment":[{"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/media?parent=2675"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/categories?post=2675"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/tags?post=2675"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}