
{"id":12318,"date":"2020-06-29T17:00:16","date_gmt":"2020-06-29T09:00:16","guid":{"rendered":"https:\/\/newsletter.bluebeecloud.com\/en\/?p=12318"},"modified":"2020-07-20T14:24:55","modified_gmt":"2020-07-20T06:24:55","slug":"supporting-the-lifecycle-of-energy-infrastructures-with-smart-om","status":"publish","type":"post","link":"https:\/\/newsletter.bluebeecloud.com\/en\/reliability\/supporting-the-lifecycle-of-energy-infrastructures-with-smart-om\/","title":{"rendered":"Supporting the lifecycle of energy infrastructures with Smart O&#038;M"},"content":{"rendered":"<div style=\"text-align: justify;\"><em>This article was previously published in <a href=\"https:\/\/www.sivecochina.com\/en\/articles\/article-supporting-lifecycle-energy-infrastructures-smart-om-published-apuea-magazine\" rel=\"noopener\" target=\"_blank\">the March 2020 issue of APUEA magazine<\/a>.<\/em><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">In the era of industry 4.0, most energy projects in Asia still enter commercial operation without a maintenance system in place. Instead, the operation and maintenance (O&#038;M) team, already busy with start-up issues, struggles to gather technical documentation, to define paper-based procedures and when time allows, years later, to implement computerized system. <\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>For maintenance, the earlier the better<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Experience shows that the earlier maintenance is taken into account, the better results in terms of lifecycle cost. Maintenance should be specifically addressed from the design stage and throughout construction, until the plant is finally handed over to the O&#038;M team. In practice, however, maintenance preparation tends to be overlooked. Construction projects are full of challenges, EPC companies and equipment suppliers lack an overall lifecycle perspective and owner\u2019s construction teams naturally focus on the problems at hand.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">The implementation of the supporting IT system (commonly known as Computerized Maintenance Management Systems or CMMS, often referred to as Enterprise Asset Management or EAM in IT parlance) usually come as an afterthought, in spite of its proven value as a tool to handover technical documentation and to structure the maintenance organization. As a result, most plants start up and, sometimes run for years without a structured and modern maintenance system in place. Plants are instead relying on paper forms and Excel sheets where historical records are hard to find and systematic analysis is impossible.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">This depressing state of affairs persists in the age of Industry 4.0 and Smart Plants.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>A more in-depth look into \u201cEAM\u201d projects<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">When the IT system is finally online a few years later, its usage seldom meets expectations. Paper and Excel processes usually remain with the new system adding another layer of mandatory administration. Technology vendors are prompt to blame clients for their lack of maturity: the software was good, but the team is not ready for it! The objective for the project (the need to improve) becomes the excuse for its failure.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Siveco\u2019s in-depth audits of Asia utilities having implemented CMMS\/EAM solutions, consistently show that the areas most essential for maintenance improvement (as per the ISO 55000 Asset Management standard) are gravely lacking. Instead, projects cover administrative needs of little value for industrial improvement, such as time and cost tracking and approval workflows, as illustrated in the radar chart below. This is understandable, as virtually all EAM projects are driven by IT departments and IT vendors with limited understanding of maintenance.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 340px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2020\/06\/1.jpg\" alt=\"\" width=\"540\" height=\"330\" \/><br \/><span style=\"padding-top: 4px;\"><em>Typical coverage of \u201cEAM\u201d systems (achieved vs. objective in %)<\/em><\/span><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">The example of failure analysis provides a good illustration: it is essential for optimizing maintenance (for example through RCM) to collect failure information in a structured manner for systematic analysis. Studies show that 88% of the failures reported in EAM systems do not include a failure code (either no code at all or a generic code such as \u201cmiscellaneous\u201d), thus rendering the entire system almost useless.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 202px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2020\/06\/2.jpg\" alt=\"\" width=\"540\" height=\"192\" \/><br \/><span style=\"padding-top: 4px;\"><em>Study of Maximo data over a 3-year period<\/em><\/span><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Finally, most EAM solutions still rely on printed papers, manual inputs by a junior technician or system clerk, just like in the 1980.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Learning from experience<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Based on a long experience all over the world and lessons learnt during the rapid, and massive Chinese infrastructure built-up of the past 20 years, Siveco has developed innovative Smart O&#038;M solutions (a term coined to differentiate from the traditional CMMS\/EAM) integrating modern technologies such as mobility, 3D Building Information Models (BIM) and Connected Objects for the benefits of O&#038;M teams. The company has also devised practical guidelines for the design, implementation and long-term stewardship of Smart O&#038;M projects. <\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">First of all, Smart O&#038;M requirements must be incorporated in construction budgets, and ideally be included in the EPC tender, in order to pass the data preparation responsibility to the construction team, ensuring smooth transfer of technical documentation from construction to operation and enforcing good maintenance practice from day one. This early-stage approach also allows a smooth integration with control systems (DCS\/SCADA).<\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\"><\/div>\n<div style=\"padding-left:50px;\">The figure below summarizes the Siveco approach for maintenance preparation during a construction project based on the utilization of the Smart O&#038;M.<\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 339px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2020\/06\/3.jpg\" alt=\"\" width=\"540\" height=\"339\" \/><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">For the design of the Smart O&#038;M system itself, focus on the gaps observed in traditional IT\/EAM projects using the ISO 55000 Asset Management standard as a frame of reference. Use ISO 55000 to drive the project and avoid the complexification or confusion often seen with IT or administrative projects.<\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">Finally, focus on people, technicians, and decision makers, rather than processes or technology. This is easily achieved by using modern user interfaces, such as mobile solutions (eliminating the need for paper and tedious manual inputs) and large touchscreens (making otherwise hidden O&#038;M information highly visible and tangible to decision makers). This cannot be improvised and must be supported by the chosen software. <\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 226px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2020\/06\/4.png\" alt=\"\" width=\"540\" height=\"216\" \/><br \/><span style=\"padding-top: 4px;\"><em>bluebee\u00ae is Siveco\u2019s mobile solution \u201cfor the worker of tomorrow\u201d<\/em><\/span><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Recent energy projects have benefited from Siveco\u2019s Smart O&#038;M approach in Asia:<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Chonburi Clean Energy (Thailand)<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><a href=\"https:\/\/www.sivecochina.com\/en\/news\/chonburi-clean-energy-selects-coswin-8i-wte-plant-thailand\" rel=\"noopener\" target=\"_blank\">Chonburi Clean Energy (CCE)<\/a>, a joint venture of Suez, Glow Energy and WHA Utilities and Power, is the first industrial waste-to-energy facility in Southeast Asia to meet European emission standards. The plant is getting attention in the Thai utility market as a showcase for maintenance preparation during the construction phase, with its Smart O&#038;M system ready before start-up. CCE is the first company to use the bluebee\u00ae mobile app in Thai.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 360px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2020\/06\/CCE_DSCF4343.JPG\" alt=\"\" width=\"540\" height=\"360\" \/><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Raffles City Chongqing District Cooling Plant (China)<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">A subsidiary of SP Group, Shirui Energy designed, built, owns and now operates the advanced energy-efficient cooling system of <a href=\"https:\/\/www.sivecochina.com\/en\/news\/bluebeer-support-smart-om-shirui-s-raffles-city-chongqing-hvac-project\" rel=\"noopener\" target=\"_blank\">Raffles City Chongqing<\/a>, an iconic real estate project. Siveco provides cloud-based lifecycle support for the facilities. Technicians used bluebee\u00ae mobile for commissioning and for day-to-day maintenance management since start-up.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Hanas New Energy (China)<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/life_cycle_support_for_hanas_new_energy_lng_plant\/\" rel=\"noopener\" target=\"_blank\">Hanas New Energy<\/a> owns and operates the largest LNG plant in China. Siveco has supported the plant with its maintenance needs from the construction stage, working alongside the EPC and contractors. The Smart O&#038;M solution provides support for continuous performance improvement in spite of the LNG plant\u2019s high staff turnover.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Ranhill Powertron II (Malaysia)<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">The 190 MW combined-cycle power plant was built by<a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/customer_story-a_collaborative_approach_to_asset_lifecycle_management_in_gas_turbine_power_plant_project\/\" rel=\"noopener\" target=\"_blank\"> China National Electric Engineering Company (CNEEC)<\/a>. Siveco led a collaborative project to ensure maintenance readiness. According to the client, Siveco\u2019s role was \u201ccritical, considering the very different working practices between Chinese construction firms and overseas power plant operators like us\u201d.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Algerian Mega-Project (Algeria)<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><a href=\"https:\/\/www.sivecochina.com\/en\/news\/siveco_signs_with_korean_epc_for_another_algerian_power_plant_project\" rel=\"noopener\" target=\"_blank\">The Algerian government<\/a> has launched a massive investment program, with around 12 GW of capacity (combined cycle gas turbine power plants) added to the grid between 2015 and 2020. For all projects, Siveco China has delivered the maintenance system, including data preparation services, in cooperation with Turkish and Korean EPC companies, before the plants start-up. <\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Yingde Gases (China)<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Asia\u2019s largest industrial gas producer, <a href=\"https:\/\/www.sivecochina.com\/en\/news\/yingde-gases-goes-live-siveco-smart-om-solution\" rel=\"noopener\" target=\"_blank\">Yingde Gases<\/a> selected Siveco to implement an ISO 55000-compliant Maintenance and Reliability management system unified across 100+ plants of heterogeneous background (older assets, recent acquisitions, modern plants, etc.). All O&#038;M staff carry out their daily work with the mobile app and touchscreens, at plant and group level, make performance improvement visible to all stakeholders.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Other Siveco infrastructure clients in the region include Brunei\u2019s Department of Electrical Services, <a href=\"https:\/\/www.sivecochina.com\/en\/news\/beijing_waste_to_energy_plant_selects_siveco\/\" rel=\"noopener\" target=\"_blank\">Beijing Environment<\/a>, <a href=\"https:\/\/www.sivecochina.com\/en\/news\/first_coswin_8i_project_in_indonesia_banjarsari_mine_mouth_coal_fired_steam_power_plant\" rel=\"noopener\" target=\"_blank\">Bukit Asam<\/a>, <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/the-implementation-of-iso-55000-and-maintenance-4-0-at-capital-water\/\" rel=\"noopener\" target=\"_blank\">Capital Water<\/a>, <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/bim_for_building_asset_integrity_management\/\" rel=\"noopener\" target=\"_blank\">CNOOC<\/a>, <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/storage-terminal-takes-risk-asset-management-to-world-class-level-with-bluebee-cloud\/\" rel=\"noopener\" target=\"_blank\">COSCO Terminals<\/a>, <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/customer_story-fushun_mining_groups_atp_project\/\" rel=\"noopener\" target=\"_blank\">Fushun Mining<\/a>, <a href=\"https:\/\/www.sivecochina.com\/en\/news\/siveco_to_support_distributed_energy_project_in_sichuan\" rel=\"noopener\" target=\"_blank\">Engie<\/a>, <a href=\"https:\/\/www.sivecochina.com\/en\/news\/everbright-sita-solid-waste-treatment-changzhou-limited-selects-siveco-for-cmms-project\" rel=\"noopener\" target=\"_blank\">Everbright<\/a>, <a href=\"https:\/\/www.sivecochina.com\/en\/news\/siveco-china-to-deliver-cmms-for-new-algerian-power-plant\/\" rel=\"noopener\" target=\"_blank\">Hyundai E&#038;C<\/a>, <a href=\"https:\/\/www.sivecochina.com\/en\/news\/samsung-ct-selects-siveco-china-combined-cycle-power-plant-algeria\" rel=\"noopener\" target=\"_blank\">Samsung C&#038;T<\/a>, <a href=\"https:\/\/www.sivecochina.com\/en\/news\/shell_oil_storage_joint_venture_selects_siveco_for_cmms\/\" rel=\"noopener\" target=\"_blank\">Shell<\/a>, <a href=\"https:\/\/www.sivecochina.com\/en\/news\/siveco-and-suez-nws-sign-smart-om-agreement\" rel=\"noopener\" target=\"_blank\">Suez NWS<\/a>, etc. Siveco also works with multisite manufacturers such as <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/customer_story-fushun_mining_groups_atp_project\/\" rel=\"noopener\" target=\"_blank\">Arkema<\/a>, <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/digitalizing-om-management-at-baosteel-gases-plants-with-emm-and-bluebee\/\" rel=\"noopener\" target=\"_blank\">Baosteel<\/a>, <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/customer_story-world_leader_in-optical_products_benefits_from_integrating_maintenance_in_their_supply_chain\/\" rel=\"noopener\" target=\"_blank\">Essilor<\/a>, <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/daramic-thailand-towards-world-class-maintenance\/\" rel=\"noopener\" target=\"_blank\">Daramic<\/a>, International Paper, <a href=\"https:\/\/www.sivecochina.com\/en\/news\/imerys-aluminates-china-goes-live-coswin-8i\" rel=\"noopener\" target=\"_blank\">Imerys<\/a>, <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/mane-fragrance-flavour-ensures-traceability-streamlines-compliance-audits-with-maintenance-4-0\/\" rel=\"noopener\" target=\"_blank\">Mane<\/a>, etc. that operate plants across Southeast Asia.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Conclusion<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">The early-stage Smart O&#038;M approach devised by Siveco to ensure maintenance readiness has a proven track record of over 850 projects in Asia. Ideally funded by construction Capex, the project generates direct savings as early as the O&#038;M handover process (reduced labor, avoided delays and data losses). The solution supports commissioning activities, makes accurate plant documentation accessible by O&#038;M teams and ensures maintenance readiness from day one. Last but not least, the Smart O&#038;M successfully closes the \u201cISO 55000 feedback loop\u201d between plant technicians and top managers, thanks to the innovative use of mobility and decision-support tools running on large touchscreens.<\/div>\n<p>&nbsp;<\/br><\/p>\n","protected":false},"excerpt":{"rendered":"<div style=\"text-align: justify;\"><em>This article was previously published in <a href=\"https:\/\/www.sivecochina.com\/en\/articles\/article-supporting-lifecycle-energy-infrastructures-smart-om-published-apuea-magazine\" rel=\"noopener\" target=\"_blank\">the March 2020 issue of APUEA magazine<\/a>.<\/em><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">In the era of industry 4.0, most energy projects in Asia still enter commercial operation without a maintenance system in place. Instead, the operation and maintenance (O&#038;M) team, already busy with start-up issues, struggles to gather technical documentation, to define paper-based procedures and when time allows, years later, to implement computerized system. <\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>For maintenance, the earlier the better<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Experience shows that the earlier maintenance is taken into account, the better results in terms of lifecycle cost. Maintenance should be specifically addressed from the design stage and throughout construction, until the plant is finally handed over to the O&#038;M team. In practice, however, maintenance preparation tends to be overlooked. Construction projects are full of challenges, EPC companies and equipment suppliers lack an overall lifecycle perspective and owner\u2019s construction teams naturally focus on the problems at hand.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">The implementation of the supporting IT system (commonly known as Computerized Maintenance Management Systems or CMMS, often referred to as Enterprise Asset Management or EAM in IT parlance) usually come as an afterthought, in spite of its proven value as a tool to handover technical documentation and to structure the maintenance organization. As a result, most plants start up and, sometimes run for years without a structured and modern maintenance system in place. Plants are instead relying on paper forms and Excel sheets where historical records are hard to find and systematic analysis is impossible.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">This depressing state of affairs persists in the age of Industry 4.0 and Smart Plants.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>A more in-depth look into \u201cEAM\u201d projects<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">When the IT system is finally online a few years later, its usage seldom meets expectations. Paper and Excel processes usually remain with the new system adding another layer of mandatory administration. Technology vendors are prompt to blame clients for their lack of maturity: the software was good, but the team is not ready for it! The objective for the project (the need to improve) becomes the excuse for its failure.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Siveco\u2019s in-depth audits of Asia utilities having implemented CMMS\/EAM solutions, consistently show that the areas most essential for maintenance improvement (as per the ISO 55000 Asset Management standard) are gravely lacking. Instead, projects cover administrative needs of little value for industrial improvement, such as time and cost tracking and approval workflows, as illustrated in the radar chart below. This is understandable, as virtually all EAM projects are driven by IT departments and IT vendors with limited understanding of maintenance.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 340px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2020\/06\/1.jpg\" alt=\"\" width=\"540\" height=\"330\" \/><br \/><span style=\"padding-top: 4px;\"><em>Typical coverage of \u201cEAM\u201d systems (achieved vs. objective in %)<\/em><\/span><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">The example of failure analysis provides a good illustration: it is essential for optimizing maintenance (for example through RCM) to collect failure information in a structured manner for systematic analysis. Studies show that 88% of the failures reported in EAM systems do not include a failure code (either no code at all or a generic code such as \u201cmiscellaneous\u201d), thus rendering the entire system almost useless.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 202px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2020\/06\/2.jpg\" alt=\"\" width=\"540\" height=\"192\" \/><br \/><span style=\"padding-top: 4px;\"><em>Study of Maximo data over a 3-year period<\/em><\/span><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Finally, most EAM solutions still rely on printed papers, manual inputs by a junior technician or system clerk, just like in the 1980.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Learning from experience<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Based on a long experience all over the world and lessons learnt during the rapid, and massive Chinese infrastructure built-up of the past 20 years, Siveco has developed innovative Smart O&#038;M solutions (a term coined to differentiate from the traditional CMMS\/EAM) integrating modern technologies such as mobility, 3D Building Information Models (BIM) and Connected Objects for the benefits of O&#038;M teams. The company has also devised practical guidelines for the design, implementation and long-term stewardship of Smart O&#038;M projects. <\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">First of all, Smart O&#038;M requirements must be incorporated in construction budgets, and ideally be included in the EPC tender, in order to pass the data preparation responsibility to the construction team, ensuring smooth transfer of technical documentation from construction to operation and enforcing good maintenance practice from day one. This early-stage approach also allows a smooth integration with control systems (DCS\/SCADA).<\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\"><\/div>\n<div style=\"padding-left:50px;\">The figure below summarizes the Siveco approach for maintenance preparation during a construction project based on the utilization of the Smart O&#038;M.<\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 339px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2020\/06\/3.jpg\" alt=\"\" width=\"540\" height=\"339\" \/><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">For the design of the Smart O&#038;M system itself, focus on the gaps observed in traditional IT\/EAM projects using the ISO 55000 Asset Management standard as a frame of reference. Use ISO 55000 to drive the project and avoid the complexification or confusion often seen with IT or administrative projects.<\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">Finally, focus on people, technicians, and decision makers, rather than processes or technology. This is easily achieved by using modern user interfaces, such as mobile solutions (eliminating the need for paper and tedious manual inputs) and large touchscreens (making otherwise hidden O&#038;M information highly visible and tangible to decision makers). This cannot be improvised and must be supported by the chosen software. <\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 226px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2020\/06\/4.png\" alt=\"\" width=\"540\" height=\"216\" \/><br \/><span style=\"padding-top: 4px;\"><em>bluebee\u00ae is Siveco\u2019s mobile solution \u201cfor the worker of tomorrow\u201d<\/em><\/span><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Recent energy projects have benefited from Siveco\u2019s Smart O&#038;M approach in Asia:<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Chonburi Clean Energy (Thailand)<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><a href=\"https:\/\/www.sivecochina.com\/en\/news\/chonburi-clean-energy-selects-coswin-8i-wte-plant-thailand\" rel=\"noopener\" target=\"_blank\">Chonburi Clean Energy (CCE)<\/a>, a joint venture of Suez, Glow Energy and WHA Utilities and Power, is the first industrial waste-to-energy facility in Southeast Asia to meet European emission standards. The plant is getting attention in the Thai utility market as a showcase for maintenance preparation during the construction phase, with its Smart O&#038;M system ready before start-up. CCE is the first company to use the bluebee\u00ae mobile app in Thai.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 360px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2020\/06\/CCE_DSCF4343.JPG\" alt=\"\" width=\"540\" height=\"360\" \/><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Raffles City Chongqing District Cooling Plant (China)<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">A subsidiary of SP Group, Shirui Energy designed, built, owns and now operates the advanced energy-efficient cooling system of <a href=\"https:\/\/www.sivecochina.com\/en\/news\/bluebeer-support-smart-om-shirui-s-raffles-city-chongqing-hvac-project\" rel=\"noopener\" target=\"_blank\">Raffles City Chongqing<\/a>, an iconic real estate project. Siveco provides cloud-based lifecycle support for the facilities. Technicians used bluebee\u00ae mobile for commissioning and for day-to-day maintenance management since start-up.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Hanas New Energy (China)<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/life_cycle_support_for_hanas_new_energy_lng_plant\/\" rel=\"noopener\" target=\"_blank\">Hanas New Energy<\/a> owns and operates the largest LNG plant in China. Siveco has supported the plant with its maintenance needs from the construction stage, working alongside the EPC and contractors. The Smart O&#038;M solution provides support for continuous performance improvement in spite of the LNG plant\u2019s high staff turnover.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Ranhill Powertron II (Malaysia)<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">The 190 MW combined-cycle power plant was built by<a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/customer_story-a_collaborative_approach_to_asset_lifecycle_management_in_gas_turbine_power_plant_project\/\" rel=\"noopener\" target=\"_blank\"> China National Electric Engineering Company (CNEEC)<\/a>. Siveco led a collaborative project to ensure maintenance readiness. According to the client, Siveco\u2019s role was \u201ccritical, considering the very different working practices between Chinese construction firms and overseas power plant operators like us\u201d.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Algerian Mega-Project (Algeria)<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><a href=\"https:\/\/www.sivecochina.com\/en\/news\/siveco_signs_with_korean_epc_for_another_algerian_power_plant_project\" rel=\"noopener\" target=\"_blank\">The Algerian government<\/a> has launched a massive investment program, with around 12 GW of capacity (combined cycle gas turbine power plants) added to the grid between 2015 and 2020. For all projects, Siveco China has delivered the maintenance system, including data preparation services, in cooperation with Turkish and Korean EPC companies, before the plants start-up. <\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Yingde Gases (China)<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Asia\u2019s largest industrial gas producer, <a href=\"https:\/\/www.sivecochina.com\/en\/news\/yingde-gases-goes-live-siveco-smart-om-solution\" rel=\"noopener\" target=\"_blank\">Yingde Gases<\/a> selected Siveco to implement an ISO 55000-compliant Maintenance and Reliability management system unified across 100+ plants of heterogeneous background (older assets, recent acquisitions, modern plants, etc.). All O&#038;M staff carry out their daily work with the mobile app and touchscreens, at plant and group level, make performance improvement visible to all stakeholders.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Other Siveco infrastructure clients in the region include Brunei\u2019s Department of Electrical Services, <a href=\"https:\/\/www.sivecochina.com\/en\/news\/beijing_waste_to_energy_plant_selects_siveco\/\" rel=\"noopener\" target=\"_blank\">Beijing Environment<\/a>, <a href=\"https:\/\/www.sivecochina.com\/en\/news\/first_coswin_8i_project_in_indonesia_banjarsari_mine_mouth_coal_fired_steam_power_plant\" rel=\"noopener\" target=\"_blank\">Bukit Asam<\/a>, <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/the-implementation-of-iso-55000-and-maintenance-4-0-at-capital-water\/\" rel=\"noopener\" target=\"_blank\">Capital Water<\/a>, <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/bim_for_building_asset_integrity_management\/\" rel=\"noopener\" target=\"_blank\">CNOOC<\/a>, <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/storage-terminal-takes-risk-asset-management-to-world-class-level-with-bluebee-cloud\/\" rel=\"noopener\" target=\"_blank\">COSCO Terminals<\/a>, <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/customer_story-fushun_mining_groups_atp_project\/\" rel=\"noopener\" target=\"_blank\">Fushun Mining<\/a>, <a href=\"https:\/\/www.sivecochina.com\/en\/news\/siveco_to_support_distributed_energy_project_in_sichuan\" rel=\"noopener\" target=\"_blank\">Engie<\/a>, <a href=\"https:\/\/www.sivecochina.com\/en\/news\/everbright-sita-solid-waste-treatment-changzhou-limited-selects-siveco-for-cmms-project\" rel=\"noopener\" target=\"_blank\">Everbright<\/a>, <a href=\"https:\/\/www.sivecochina.com\/en\/news\/siveco-china-to-deliver-cmms-for-new-algerian-power-plant\/\" rel=\"noopener\" target=\"_blank\">Hyundai E&#038;C<\/a>, <a href=\"https:\/\/www.sivecochina.com\/en\/news\/samsung-ct-selects-siveco-china-combined-cycle-power-plant-algeria\" rel=\"noopener\" target=\"_blank\">Samsung C&#038;T<\/a>, <a href=\"https:\/\/www.sivecochina.com\/en\/news\/shell_oil_storage_joint_venture_selects_siveco_for_cmms\/\" rel=\"noopener\" target=\"_blank\">Shell<\/a>, <a href=\"https:\/\/www.sivecochina.com\/en\/news\/siveco-and-suez-nws-sign-smart-om-agreement\" rel=\"noopener\" target=\"_blank\">Suez NWS<\/a>, etc. Siveco also works with multisite manufacturers such as <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/customer_story-fushun_mining_groups_atp_project\/\" rel=\"noopener\" target=\"_blank\">Arkema<\/a>, <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/digitalizing-om-management-at-baosteel-gases-plants-with-emm-and-bluebee\/\" rel=\"noopener\" target=\"_blank\">Baosteel<\/a>, <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/customer_story-world_leader_in-optical_products_benefits_from_integrating_maintenance_in_their_supply_chain\/\" rel=\"noopener\" target=\"_blank\">Essilor<\/a>, <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/daramic-thailand-towards-world-class-maintenance\/\" rel=\"noopener\" target=\"_blank\">Daramic<\/a>, International Paper, <a href=\"https:\/\/www.sivecochina.com\/en\/news\/imerys-aluminates-china-goes-live-coswin-8i\" rel=\"noopener\" target=\"_blank\">Imerys<\/a>, <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/mane-fragrance-flavour-ensures-traceability-streamlines-compliance-audits-with-maintenance-4-0\/\" rel=\"noopener\" target=\"_blank\">Mane<\/a>, etc. that operate plants across Southeast Asia.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Conclusion<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">The early-stage Smart O&#038;M approach devised by Siveco to ensure maintenance readiness has a proven track record of over 850 projects in Asia. Ideally funded by construction Capex, the project generates direct savings as early as the O&#038;M handover process (reduced labor, avoided delays and data losses). The solution supports commissioning activities, makes accurate plant documentation accessible by O&#038;M teams and ensures maintenance readiness from day one. Last but not least, the Smart O&#038;M successfully closes the \u201cISO 55000 feedback loop\u201d between plant technicians and top managers, thanks to the innovative use of mobility and decision-support tools running on large touchscreens.<\/div>\n<p>&nbsp;<\/br><\/p>\n","protected":false},"author":1,"featured_media":12321,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[305,395,102,131,286,296],"_links":{"self":[{"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/posts\/12318"}],"collection":[{"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/comments?post=12318"}],"version-history":[{"count":18,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/posts\/12318\/revisions"}],"predecessor-version":[{"id":12364,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/posts\/12318\/revisions\/12364"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/media\/12321"}],"wp:attachment":[{"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/media?parent=12318"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/categories?post=12318"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/tags?post=12318"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}