
{"id":10752,"date":"2017-05-26T11:59:39","date_gmt":"2017-05-26T03:59:39","guid":{"rendered":"https:\/\/newsletter.bluebeecloud.com\/en\/?p=10752"},"modified":"2017-05-26T13:43:56","modified_gmt":"2017-05-26T05:43:56","slug":"leading-auto-parts-maker-optimizes-maintenance-with-coswin-8i","status":"publish","type":"post","link":"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/leading-auto-parts-maker-optimizes-maintenance-with-coswin-8i\/","title":{"rendered":"Leading auto parts maker optimizes maintenance with Coswin 8i"},"content":{"rendered":"<div style=\"text-align: justify;\"><strong>Sogefi (Suzhou) Automotive Parts Co., Ltd.<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div class=\"wp-caption alignright\" style=\"width: 205px; height: 46px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2017\/05\/SOGEFI_GROUP-LOGO1.jpg\" alt=\"\" width=\"200\" height=\"44\" \/><\/div>\n<div style=\"text-align: justify;\">Sogefi (Suzhou) Automotive Parts started operation in 2014. The factory, located in the Wujiang Economic &#038; Technological Development Zone, produces suspension components. It is a subsidiary of Sogefi Group (<a href=\"http:\/\/www.sogefigroup.com\/\" target=\"_blank\">www.sogefigroup.com<\/a>), a leading global supplier of original parts for the automotive industry, with over 35 years\u2019 experience. Sogefi designs, develops and produces filtration systems and flexible suspension components as well as air management and engine cooling systems. Sogefi is listed on the Milan Stock Exchange and has a commercial presence in 21 countries on 4 continents, with 42 manufacturing sites and 16 sales offices. <\/div>\n<p>&nbsp;<\/br><\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 360px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2017\/05\/sogefi_plant.jpg\" alt=\"\" width=\"540\" height=\"360\" \/><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Project background<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">After the factory was setup, the priority was naturally to ramp up production, not to optimize maintenance. The company\u2019s management team was however well aware of the importance of maintenance and initiated discussions with Siveco as early as 2014 during the startup phase. The topic gradually gained traction and became a priority at the end of 2015, with a clear need to improve maintenance efficiency and to keep costs under control.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Specific challenges met by the maintenance and production teams of the Sogefi Suzhou plant at that time included:<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">Traditional paper- and Excel-based processes started to become overwhelming and time consuming<\/div>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">In particular, all preventive maintenance planning was done manually using Excel sheets<\/div>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">Spare parts consumption could not be traced to related maintenance work or equipment, making it difficult to optimize.<\/div>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">The maintenance of tools and dies needed to be reorganized.<\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div style=\"text-align: justify;\">Sogefi Suzhou decided to hire Siveco China to run the maintenance improvement project by implementing the Coswin 8i computerized maintenance management system (CMMS). Siveco had previously completed similar projects for Sogefi Shanghai factory and had extensive experience helping other automotive suppliers optimize their maintenance in China.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Implementation schedule<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">The Maintenance Improvement project, based on the implementation of Coswin 8i, was kick-off in July 2016. One month later, the \u201cCore Model\u201d defining the maintenance organization and the supporting system was approved. Coswin 8i was then configured and tested on site. Sogefi\u2019s maintenance team received training and on-the-job coaching by Siveco. The system was finally put into production in October 2016, four months after project start.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 315px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2017\/05\/sogefi team.jpg\" alt=\"\" width=\"540\" height=\"303\" \/><br \/><span style=\"padding-top: 4px;\"><em>The joint Sogefi-Siveco project team<\/em><\/span><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>The CMMS Coswin 8i<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Sogefi Suzhou\u2019s maintenance management processes are supported by Coswin 8i. The system, implemented based on a Core Model aligned with the company\u2019s objectives, covers the following main functional areas:<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">Asset management: asset structure, basic information such as criticality, category, technical attributes, spare part list and so on.<\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">Fault Reporting: the entire corrective maintenance process, but with a strong emphasis on fault reporting and following up spare parts usage.<\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">Preventive Maintenance: definition of job guidelines and planning, for inspections and regular maintenance.<\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 375px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2017\/05\/premaintenance.jpg\" alt=\"\" width=\"540\" height=\"363\" \/><br \/><span style=\"padding-top: 4px;\"><em>Preventive maintenance planning<\/em><\/span><\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">Tooling management: based on the tool\u2019s production meter value, recorded by production team. Tooling team plans and executes related preventive maintenance work according to the predefined alarm values.<\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">Spare part management: interface with SAP, spare part list and basic information such as code, description, quantity, price, etc\u2026 are imported from SAP automatically through Coswin 8i\u2019s Clic-Clac interface tool.<\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 266px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2017\/05\/spare parts.jpg\" alt=\"\" width=\"540\" height=\"264\" \/><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Cockpits and Reports: the system automatically generates KPIs for day-to-day management and analysis reports for decision support.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 244px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2017\/05\/Cockpit.jpg\" alt=\"\" width=\"540\" height=\"232\" \/><br \/><span style=\"padding-top: 4px;\"><em>KPIs in the maintenance \u201cCockpit\u201d<\/em><\/span><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Benefits<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">The project objectives have been met.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">According to Zhou Ronghua, Maintenance Manager at Sogefi (Suzhou) Auto Parts:<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><em>\u201cSogefi Suzhou has successfully got rid of Excel and paper-based maintenance management. Our entire Work Order process is now managed in Coswin: critical data is captured, allowing systematic analysis and improvement initiatives. Work efficiency has greatly improved. Maintenance management is now under control for the first time.\u201d<\/em><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">His manager Emilien Delecluse, Operations Manager, also said:<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><em>\u201cI am glad to see our maintenance team is satisfied by the efficient management of preventive and predictive maintenance. Our priority is now to gain benefits from monthly analysis of maintenance activity and performance: our CMMS provides the necessary tool for this.\u201d<\/em><\/div>\n<p>&nbsp;<\/br><\/p>\n","protected":false},"excerpt":{"rendered":"<div style=\"text-align: justify;\"><strong>Sogefi (Suzhou) Automotive Parts Co., Ltd.<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div class=\"wp-caption alignright\" style=\"width: 205px; height: 46px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2017\/05\/SOGEFI_GROUP-LOGO1.jpg\" alt=\"\" width=\"200\" height=\"44\" \/><\/div>\n<div style=\"text-align: justify;\">Sogefi (Suzhou) Automotive Parts started operation in 2014. The factory, located in the Wujiang Economic &#038; Technological Development Zone, produces suspension components. It is a subsidiary of Sogefi Group (<a href=\"http:\/\/www.sogefigroup.com\/\" target=\"_blank\">www.sogefigroup.com<\/a>), a leading global supplier of original parts for the automotive industry, with over 35 years\u2019 experience. Sogefi designs, develops and produces filtration systems and flexible suspension components as well as air management and engine cooling systems. Sogefi is listed on the Milan Stock Exchange and has a commercial presence in 21 countries on 4 continents, with 42 manufacturing sites and 16 sales offices. <\/div>\n<p>&nbsp;<\/br><\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 360px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2017\/05\/sogefi_plant.jpg\" alt=\"\" width=\"540\" height=\"360\" \/><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Project background<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">After the factory was setup, the priority was naturally to ramp up production, not to optimize maintenance. The company\u2019s management team was however well aware of the importance of maintenance and initiated discussions with Siveco as early as 2014 during the startup phase. The topic gradually gained traction and became a priority at the end of 2015, with a clear need to improve maintenance efficiency and to keep costs under control.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Specific challenges met by the maintenance and production teams of the Sogefi Suzhou plant at that time included:<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">Traditional paper- and Excel-based processes started to become overwhelming and time consuming<\/div>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">In particular, all preventive maintenance planning was done manually using Excel sheets<\/div>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">Spare parts consumption could not be traced to related maintenance work or equipment, making it difficult to optimize.<\/div>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">The maintenance of tools and dies needed to be reorganized.<\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div style=\"text-align: justify;\">Sogefi Suzhou decided to hire Siveco China to run the maintenance improvement project by implementing the Coswin 8i computerized maintenance management system (CMMS). Siveco had previously completed similar projects for Sogefi Shanghai factory and had extensive experience helping other automotive suppliers optimize their maintenance in China.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Implementation schedule<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">The Maintenance Improvement project, based on the implementation of Coswin 8i, was kick-off in July 2016. One month later, the \u201cCore Model\u201d defining the maintenance organization and the supporting system was approved. Coswin 8i was then configured and tested on site. Sogefi\u2019s maintenance team received training and on-the-job coaching by Siveco. The system was finally put into production in October 2016, four months after project start.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 315px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2017\/05\/sogefi team.jpg\" alt=\"\" width=\"540\" height=\"303\" \/><br \/><span style=\"padding-top: 4px;\"><em>The joint Sogefi-Siveco project team<\/em><\/span><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>The CMMS Coswin 8i<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Sogefi Suzhou\u2019s maintenance management processes are supported by Coswin 8i. The system, implemented based on a Core Model aligned with the company\u2019s objectives, covers the following main functional areas:<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">Asset management: asset structure, basic information such as criticality, category, technical attributes, spare part list and so on.<\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">Fault Reporting: the entire corrective maintenance process, but with a strong emphasis on fault reporting and following up spare parts usage.<\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">Preventive Maintenance: definition of job guidelines and planning, for inspections and regular maintenance.<\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 375px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2017\/05\/premaintenance.jpg\" alt=\"\" width=\"540\" height=\"363\" \/><br \/><span style=\"padding-top: 4px;\"><em>Preventive maintenance planning<\/em><\/span><\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">Tooling management: based on the tool\u2019s production meter value, recorded by production team. Tooling team plans and executes related preventive maintenance work according to the predefined alarm values.<\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">\u2022<\/div>\n<div style=\"padding-left:50px;\">Spare part management: interface with SAP, spare part list and basic information such as code, description, quantity, price, etc\u2026 are imported from SAP automatically through Coswin 8i\u2019s Clic-Clac interface tool.<\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 266px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2017\/05\/spare parts.jpg\" alt=\"\" width=\"540\" height=\"264\" \/><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Cockpits and Reports: the system automatically generates KPIs for day-to-day management and analysis reports for decision support.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 545px; height: 244px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2017\/05\/Cockpit.jpg\" alt=\"\" width=\"540\" height=\"232\" \/><br \/><span style=\"padding-top: 4px;\"><em>KPIs in the maintenance \u201cCockpit\u201d<\/em><\/span><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Benefits<\/strong><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">The project objectives have been met.<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">According to Zhou Ronghua, Maintenance Manager at Sogefi (Suzhou) Auto Parts:<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><em>\u201cSogefi Suzhou has successfully got rid of Excel and paper-based maintenance management. Our entire Work Order process is now managed in Coswin: critical data is captured, allowing systematic analysis and improvement initiatives. Work efficiency has greatly improved. Maintenance management is now under control for the first time.\u201d<\/em><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">His manager Emilien Delecluse, Operations Manager, also said:<\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\"><em>\u201cI am glad to see our maintenance team is satisfied by the efficient management of preventive and predictive maintenance. Our priority is now to gain benefits from monthly analysis of maintenance activity and performance: our CMMS provides the necessary tool for this.\u201d<\/em><\/div>\n<p>&nbsp;<\/br><\/p>\n","protected":false},"author":1,"featured_media":10760,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[4,10,266,348],"_links":{"self":[{"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/posts\/10752"}],"collection":[{"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/comments?post=10752"}],"version-history":[{"count":9,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/posts\/10752\/revisions"}],"predecessor-version":[{"id":10796,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/posts\/10752\/revisions\/10796"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/media\/10760"}],"wp:attachment":[{"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/media?parent=10752"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/categories?post=10752"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/tags?post=10752"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}