
{"id":10222,"date":"2016-10-28T15:19:42","date_gmt":"2016-10-28T07:19:42","guid":{"rendered":"https:\/\/newsletter.bluebeecloud.com\/en\/?p=10222"},"modified":"2016-11-04T11:08:24","modified_gmt":"2016-11-04T03:08:24","slug":"suez_nantong_waste_to_energy_plant_optimizes_maintenance_and_overhaul_with_coswin_8i","status":"publish","type":"post","link":"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/suez_nantong_waste_to_energy_plant_optimizes_maintenance_and_overhaul_with_coswin_8i\/","title":{"rendered":"Suez Nantong waste-to-energy plant optimizes maintenance and overhaul with Coswin 8i"},"content":{"rendered":"<div style=\"text-align: justify;\">In March 2014, <a href=\"http:\/\/www.suez-environnement.cn\/en\" target=\"_blank\">Suez Environnement<\/a> subsidiary <a href=\"http:\/\/www.sita.hk\/en_main.html\" target=\"_blank\">SITA Waste Services<\/a> established a joint venture with Shanghai Chemical Industry Park Investment Corporate (SCIP) and Nantong Economic Technology and Development Area Company (NETDA) for the construction and operation of a new hazardous waste plant in the Nantong Economic Technology and Development Area. The contract will approximately generate a revenue of 4.9 billion RMB in the coming 30 years. <\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\">The energy recovery and treatment plant (referred to as \u201cSITA Nantong\u201d) has a design capacity of 30,000 tons\/year for the treatment of locally-generated hazardous waste and 3,300 tons\/year for medical waste. This state-of-the-art incinerator strictly meets both Chinese and European emission standards and is managed according to the best international safety and environmental standards.<\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Why the project?<\/strong><\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\">Siveco was selected to implement the Coswin 8i computerized maintenance management system (CMMS) for the plant, when it was still under construction, in order to: <\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">&#8211;<\/div>\n<div style=\"padding-left:50px;\">Define the plant maintenance strategy in compliance with group best practices and international practices and standards<\/div>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">&#8211;<\/div>\n<div style=\"padding-left:50px;\">Ensure smooth handover from construction to operation<\/div>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">&#8211;<\/div>\n<div style=\"padding-left:50px;\">Record failures from the commissioning stage<\/div>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">&#8211;<\/div>\n<div style=\"padding-left:50px;\">Enforce good maintenance practices from day one<\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div style=\"text-align: justify;\"><strong>Implementing a CMMS during plant construction<\/strong><\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\">China\u2019s largest maintenance consultancy, Siveco is known to have pioneered the concept of <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/reliability\/implementing_a_cmms_during_plant_construction\/\" target=\"_blank\">implementing maintenance systems during the construction<\/a>. Siveco started working with Suez Environment companies in China in 2005 and has since delivered dozens of projects for the company\u2019s water supply, waste treatment and energy projects all over Asia.<\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\">During the third quarter of 2015, the project officially started. Two Siveco consultants teamed up with the client staff to form the joint project committee. The kick-off meeting was held in February, 2015 when plant was still under construction. One year later, the system went live, before plant start-up. <\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Results obtained <\/strong><\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\">By working with the EPC and equipment suppliers, Siveco assisted SITA Nantong to build up its \u201cas-built\u201d plant database, which was immediately used to support commissioning. <\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\">Siveco delivered a comprehensive CMMS scope, thanks to a step-by-step implementation approach aimed at promoting maintenance improvement at the plant, through a progressive structuring of the maintenance activity towards systematic analysis and preventive maintenance. <\/div>\n<p><\/br><\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 555px; height: 248px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2016\/10\/customer.jpg\" alt=\"\" width=\"550\" height=\"250\" \/><\/div>\n<p>&nbsp;<\/br><\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 555px; height: 255px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2016\/10\/costumer2.jpg\" alt=\"\" width=\"550\" height=\"250\" \/><br \/><span style=\"padding-top: 4px;\"><em>The graphical CMMS navigation for the plant<\/em><\/span><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Siveco also defined specific report templates for plant overhauls. The same report will later be deployed to the sister SITA sites in <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/newsletter\/customer-story-sita\/\" target=\"_blank\">Shanghai<\/a> and <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/taiwanese_waste_to_energy_plant_optimizes_its_entire_operation_with_coswin\/\" target=\"_blank\">Taiwan<\/a>, allowing benchmarking of overhaul activities between sites. <\/div>\n<p><\/br><\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 555px; height: 389px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2016\/10\/customer3.jpg\" alt=\"\" width=\"550\" height=\"384\" \/><br \/><span style=\"padding-top: 4px;\"><em>Overhaul activities report<\/em><\/span><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Meanwhile, the plant is using an ERP system to manage its purchasing and stocks. An interface has been set up between the two systems to simplify maintenance cost accounting.<\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Words from the client <\/strong><\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\">Mr. Kaixiang Jie, Planning Engineer of SITA Nantong said \u201cI am very satisfied with the entire project implementation! Siveco\u2019s engineers assisted us to improve our work process, define management reports, system diagrams and the accounting interface.<\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\">With Coswin now in the place, our equipment data is available in a structured way and we have gained good habits to keep updating the technical database and consistently optimize our maintenance plan.\u201d\n<\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\"><strong>The road ahead<\/strong><\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\">On February 26, 2016, the \u201c<a href=\"http:\/\/www.sivecochina.com\/en\/news\/siveco_maintenance_training_wins_gold_award_at_suez_innovation_trophy\/\" target=\"_blank\">Maintenance Inception Training<\/a>\u201d program conducted by Siveco China for Suez waste and water treatment plants in the Greater China region won the Gold Award at the Suez Asia Innovation Trophies. The Inception Training is part of an overall Maintenance Excellence program managed by Siveco, aimed at providing a strong common guideline for all Suez maintenance teams, in order to promote, enforce and sustain good maintenance management practices.<\/div>\n<p><\/br><\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 555px; height: 355px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2016\/10\/suez.png\" alt=\"\" width=\"550\" height=\"350\" \/><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Siveco is proud to witness the business growth that Suez Asia has made in the past years over the country. The cooperation continues in 2016 with the <a href=\"http:\/\/www.sivecochina.com\/en\/news\/siveco_to_provide_cmms_for_hong_kongs_first_organic_waste_treatment_facility\/\" target=\"_blank\">first organic waste treatment facility in Hong Kong<\/a> built by Suez and the partnership between SITA and <a href=\"http:\/\/www.sivecochina.com\/en\/news\/beijing_waste_to_energy_plant_selects_siveco\/\" target=\"_blank\">Beijing Enterprises Environment Group Limited located in suburban Haidian District, Beijing<\/a>. <\/div>\n<p><\/br><\/p>\n","protected":false},"excerpt":{"rendered":"<div style=\"text-align: justify;\">In March 2014, <a href=\"http:\/\/www.suez-environnement.cn\/en\" target=\"_blank\">Suez Environnement<\/a> subsidiary <a href=\"http:\/\/www.sita.hk\/en_main.html\" target=\"_blank\">SITA Waste Services<\/a> established a joint venture with Shanghai Chemical Industry Park Investment Corporate (SCIP) and Nantong Economic Technology and Development Area Company (NETDA) for the construction and operation of a new hazardous waste plant in the Nantong Economic Technology and Development Area. The contract will approximately generate a revenue of 4.9 billion RMB in the coming 30 years. <\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\">The energy recovery and treatment plant (referred to as \u201cSITA Nantong\u201d) has a design capacity of 30,000 tons\/year for the treatment of locally-generated hazardous waste and 3,300 tons\/year for medical waste. This state-of-the-art incinerator strictly meets both Chinese and European emission standards and is managed according to the best international safety and environmental standards.<\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Why the project?<\/strong><\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\">Siveco was selected to implement the Coswin 8i computerized maintenance management system (CMMS) for the plant, when it was still under construction, in order to: <\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">&#8211;<\/div>\n<div style=\"padding-left:50px;\">Define the plant maintenance strategy in compliance with group best practices and international practices and standards<\/div>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">&#8211;<\/div>\n<div style=\"padding-left:50px;\">Ensure smooth handover from construction to operation<\/div>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">&#8211;<\/div>\n<div style=\"padding-left:50px;\">Record failures from the commissioning stage<\/div>\n<\/div>\n<div style=\"text-align: justify;\">\n<div style=\"padding-left:25px; float:left\">&#8211;<\/div>\n<div style=\"padding-left:50px;\">Enforce good maintenance practices from day one<\/div>\n<p>&nbsp;<\/br>\n<\/div>\n<div style=\"text-align: justify;\"><strong>Implementing a CMMS during plant construction<\/strong><\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\">China\u2019s largest maintenance consultancy, Siveco is known to have pioneered the concept of <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/reliability\/implementing_a_cmms_during_plant_construction\/\" target=\"_blank\">implementing maintenance systems during the construction<\/a>. Siveco started working with Suez Environment companies in China in 2005 and has since delivered dozens of projects for the company\u2019s water supply, waste treatment and energy projects all over Asia.<\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\">During the third quarter of 2015, the project officially started. Two Siveco consultants teamed up with the client staff to form the joint project committee. The kick-off meeting was held in February, 2015 when plant was still under construction. One year later, the system went live, before plant start-up. <\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Results obtained <\/strong><\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\">By working with the EPC and equipment suppliers, Siveco assisted SITA Nantong to build up its \u201cas-built\u201d plant database, which was immediately used to support commissioning. <\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\">Siveco delivered a comprehensive CMMS scope, thanks to a step-by-step implementation approach aimed at promoting maintenance improvement at the plant, through a progressive structuring of the maintenance activity towards systematic analysis and preventive maintenance. <\/div>\n<p><\/br><\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 555px; height: 248px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2016\/10\/customer.jpg\" alt=\"\" width=\"550\" height=\"250\" \/><\/div>\n<p>&nbsp;<\/br><\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 555px; height: 255px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2016\/10\/costumer2.jpg\" alt=\"\" width=\"550\" height=\"250\" \/><br \/><span style=\"padding-top: 4px;\"><em>The graphical CMMS navigation for the plant<\/em><\/span><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Siveco also defined specific report templates for plant overhauls. The same report will later be deployed to the sister SITA sites in <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/newsletter\/customer-story-sita\/\" target=\"_blank\">Shanghai<\/a> and <a href=\"https:\/\/newsletter.bluebeecloud.com\/en\/customer-story\/taiwanese_waste_to_energy_plant_optimizes_its_entire_operation_with_coswin\/\" target=\"_blank\">Taiwan<\/a>, allowing benchmarking of overhaul activities between sites. <\/div>\n<p><\/br><\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 555px; height: 389px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2016\/10\/customer3.jpg\" alt=\"\" width=\"550\" height=\"384\" \/><br \/><span style=\"padding-top: 4px;\"><em>Overhaul activities report<\/em><\/span><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Meanwhile, the plant is using an ERP system to manage its purchasing and stocks. An interface has been set up between the two systems to simplify maintenance cost accounting.<\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\"><strong>Words from the client <\/strong><\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\">Mr. Kaixiang Jie, Planning Engineer of SITA Nantong said \u201cI am very satisfied with the entire project implementation! Siveco\u2019s engineers assisted us to improve our work process, define management reports, system diagrams and the accounting interface.<\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\">With Coswin now in the place, our equipment data is available in a structured way and we have gained good habits to keep updating the technical database and consistently optimize our maintenance plan.\u201d\n<\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\"><strong>The road ahead<\/strong><\/div>\n<p><\/br><\/p>\n<div style=\"text-align: justify;\">On February 26, 2016, the \u201c<a href=\"http:\/\/www.sivecochina.com\/en\/news\/siveco_maintenance_training_wins_gold_award_at_suez_innovation_trophy\/\" target=\"_blank\">Maintenance Inception Training<\/a>\u201d program conducted by Siveco China for Suez waste and water treatment plants in the Greater China region won the Gold Award at the Suez Asia Innovation Trophies. The Inception Training is part of an overall Maintenance Excellence program managed by Siveco, aimed at providing a strong common guideline for all Suez maintenance teams, in order to promote, enforce and sustain good maintenance management practices.<\/div>\n<p><\/br><\/p>\n<div class=\"wp-caption aligncenter\" style=\"width: 555px; height: 355px;\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/newsletter.bluebeecloud.com\/en\/wp-content\/uploads\/2016\/10\/suez.png\" alt=\"\" width=\"550\" height=\"350\" \/><\/div>\n<p>&nbsp;<\/br><\/p>\n<div style=\"text-align: justify;\">Siveco is proud to witness the business growth that Suez Asia has made in the past years over the country. The cooperation continues in 2016 with the <a href=\"http:\/\/www.sivecochina.com\/en\/news\/siveco_to_provide_cmms_for_hong_kongs_first_organic_waste_treatment_facility\/\" target=\"_blank\">first organic waste treatment facility in Hong Kong<\/a> built by Suez and the partnership between SITA and <a href=\"http:\/\/www.sivecochina.com\/en\/news\/beijing_waste_to_energy_plant_selects_siveco\/\" target=\"_blank\">Beijing Enterprises Environment Group Limited located in suburban Haidian District, Beijing<\/a>. <\/div>\n<p><\/br><\/p>\n","protected":false},"author":1,"featured_media":10274,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[333,334,4,10,14,15,108,265,266,331,332],"_links":{"self":[{"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/posts\/10222"}],"collection":[{"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/comments?post=10222"}],"version-history":[{"count":10,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/posts\/10222\/revisions"}],"predecessor-version":[{"id":10272,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/posts\/10222\/revisions\/10272"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/media\/10274"}],"wp:attachment":[{"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/media?parent=10222"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/categories?post=10222"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newsletter.bluebeecloud.com\/en\/wp-json\/wp\/v2\/tags?post=10222"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}